Standing Desk vs Sitting Desk: What the Evidence Actually Says

Modern Melbourne office with a sit-stand desk raised to standing height alongside seated workstations

Sit-stand desks get sold on confidence more than evidence. "Sitting is the new smoking" made a good headline, but the research behind it is thinner than most pitches admit. If you're deciding whether to buy sit-stand desks for a Melbourne office, it helps to know what the studies actually support — and what they don't.

What the research actually shows

The clearest finding across workplace studies is about musculoskeletal discomfort, not fat loss or heart disease. Several controlled trials — including the UK's "Stand More AT Work" (SMArT Work) trial, published in the BMJ in 2018 — found that giving office workers a sit-stand desk and some coaching reduced reported lower back and neck discomfort over 12 months, compared with desks that stayed fixed.

What it didn't reliably show was a meaningful drop in weight, blood pressure, or long-term cardiovascular risk markers. Standing burns only slightly more energy than sitting — somewhere in the range of an extra 0.15 calories per minute, according to several metabolic studies. Over a working day that's not nothing, but it's not a fitness plan either.

The strongest, most consistent benefit is simpler: breaking up long static postures helps joints, discs, and circulation more than either sitting or standing all day. The World Health Organization's physical activity guidelines and multiple occupational health reviews land on the same point — it's prolonged static posture that causes problems, whichever posture that is.

Where the "sitting kills you" framing goes too far

A lot of the viral messaging traces back to large epidemiological studies — the kind that track tens of thousands of people over years and find correlations between total sitting time and mortality. Those studies are real, but they're observational. People who sit more all day often also move less overall, sleep differently, and have different job types. The desk itself isn't proven to be the causal factor; it's one piece of a much bigger picture that includes total daily activity, diet, and job type.

The honest summary: a sit-stand desk is a tool for postural variety, not a substitute for actual movement during the day. If someone sits at a sit-stand desk in the up position for six hours straight, they've swapped one static posture for another.

So is it worth buying one for a Melbourne office?

Yes — for the right reason. If staff are reporting back or neck discomfort, or your business is trying to reduce the kind of posture-related absenteeism that shows up over a few years, a sit-stand desk earns its cost. The evidence supports using it as a tool to change position every 30–60 minutes, not as a way to avoid moving altogether.

If the goal is general wellbeing and WorkSafe compliance around manual handling and workstation setup, sit-stand desks are a sensible, low-risk investment. If the goal is solving obesity or cardiovascular risk in your workforce, a desk alone won't do that — pair it with actual movement breaks, walking meetings, or a lunchtime walking culture.

Practical buying guidance for commercial fitouts

For Melbourne and Geelong offices weighing this up:

  • Budget for staff training, not just hardware. The SMArT Work trial's gains came partly from coaching staff to actually change position, not just owning a desk that could move.
  • Check motor duty cycle for commercial use. Desks rated for occasional home use can fail under all-day office cycling.
  • Plan cable management before installation, especially in open-plan Melbourne CBD fitouts where monitor arms and dual screens add weight and clutter at standing height.
  • Set a default routine — many Melbourne clients we work with land on standing for 15–20 minutes every hour as a realistic, sustainable pattern rather than an all-day stand.

If you're specifying desks as part of a broader office refresh, our sit-stand desk buying guide covers height ranges, motor specs, and warranty traps in more detail. For teams weighing ergonomic workstation setup more broadly, see our ergonomic office equipment guide.

The bottom line

Sit-stand desks reduce reported discomfort from static postures — that's the part the evidence backs clearly. They are not a proven fix for weight, heart disease, or general health outcomes on their own. Buy them to solve a posture and comfort problem, train staff to actually alternate position, and treat the desk as one part of a workplace that also encourages movement.

Setting up desks for a Melbourne or Geelong office — whether it's two desks or forty — our new office furniture range includes commercial-grade sit-stand options sized for real workplace duty cycles, with delivery and installation handled end to end.

FAQ

Does a standing desk actually burn more calories? Marginally — roughly 0.15 extra calories per minute compared with sitting, based on metabolic studies. Over an 8-hour day that's a modest difference, not a weight-loss strategy.

Is sitting all day actually as bad as smoking? No. That comparison overstates findings from observational studies that track correlation, not causation, between total sitting time and health outcomes. The clearer evidence is about static posture and musculoskeletal discomfort, not mortality risk from sitting itself.

How much should staff actually stand each day? There's no single proven number, but most occupational health guidance and workplace trials point to alternating position every 30–60 minutes rather than standing continuously or sitting continuously.

Will a sit-stand desk fix back pain on its own? It can reduce reported discomfort when paired with staff actually changing position regularly. It won't resolve existing musculoskeletal issues by itself — that needs proper ergonomic setup and, where relevant, professional advice.

Do sit-stand desks need any special installation for a commercial office? Yes. Commercial duty cycles, cable management for monitor arms, and power access all need planning before installation — especially in multi-desk open-plan fitouts.

Small Office Fitout Ideas: Making Under 100m2 Work Harder

Hush Chatterbox X acoustic meeting pod in a modern open-plan office

A lot of Melbourne and Geelong businesses outgrow their first office before they outgrow their lease. You sign for 80 or 90 square metres thinking it's generous, then six months later there's a storage cupboard doubling as a meeting room and someone's taking sales calls in the stairwell. The fix usually isn't a bigger office. It's a smarter one.

We've fitted out enough sub-100m2 spaces now to know the failure pattern: people plan for headcount and forget to plan for function. A 12-desk open floor with no acoustic separation looks efficient on a floor plan and falls apart the first time two people need a phone call at the same time.

Start with what the space actually has to do

Before furniture or finishes, list the activities that have to happen in the room: focused desk work, client meetings, phone calls, informal collaboration, storage. In under 100m2, most of these compete for the same square metres, so the fitout has to let one zone do double duty rather than carving out a dedicated room for everything.

A common brief we get: "we need a boardroom, two meeting rooms, and an open floor, and we have 70m2." That's not a floor plan problem, it's a priority problem. Something has to flex. Usually it's the boardroom — it becomes a meeting pod that converts to quiet workspace outside of client hours.

Acoustic pods do more work than a built room

In a small footprint, stud walls eat space you don't have — door swing, services, structural clearances. An acoustic pod gives you an enclosed meeting space without the construction footprint of a proper room, and it can go in on a Tuesday and move out again if the business changes shape.

The practical constraint is the external footprint of the particular pod, plus room to open its door and reach its power connection. Sizes vary: our B.Quiet Single Pod measures 1030mm wide by 1030mm deep, while the Hush Chatterbox X meeting pod measures 2218mm wide by 1198mm deep. Check the chosen model against your floor plan and delivery route before committing. A pod that looks fine in a CAD drawing can still obstruct the circulation space you need once installed.

Desking density vs desking comfort

Under 100m2 with 15+ people, the temptation is to maximise desks per square metre. That works on day one and creates a resourcing problem by month three — no one wants to sit in a space that feels like a call centre, and retention costs more than floor space.

A workable middle ground for small Melbourne offices: bench desking in clusters of four to six, oriented so no one has a laptop screen facing a walkway, with one or two standing-height benches at the edges for quick calls or laptop work that doesn't need a full desk setup. That last bit matters more than people expect — a lot of "we need another meeting room" requests are actually "we need somewhere to stand for ten minutes and not be heard."

Storage is a layout decision, not an afterthought

Filing cabinets and stationery cupboards get bolted onto whatever wall is left over, which is how you end up with a fire egress route partially blocked by a printer stand. In a small office, storage needs to be part of the zoning plan from the start — built into joinery along a structural wall, or consolidated into one storage wall rather than scattered units competing for corners.

What this actually costs

Small fitouts aren't proportionally cheaper per square metre than larger ones — in fact the opposite is often true, because fixed costs (project management, one pod, one reception area) spread over less floor space. Budget for the fitout as a function of what you're installing, not a flat rate per square metre, and get a scoped quote rather than a guess based on a floor plan alone.

The trade-off to decide on early

Every small-footprint fitout comes down to one decision: how much enclosed space do you really need versus how much open collaborative space. Clients who try to have both end up with neither working well. Pick the priority — usually it's client-facing meeting space if you see clients, or focus space if your work is deep individual tasks — and build the rest of the layout around supporting that, not competing with it.

If you're assessing a space under 100m2 and want a second opinion before you commit to a layout, we do fitout consultations across Melbourne and Geelong and can walk the measurements with you before anything gets ordered.

Thinking through a small office fitout? Book a free fitout consultation and we'll help you work out what the space can actually support.

FAQ

How small is too small for an acoustic pod? There's no universal minimum: a one-person booth can be much smaller than a meeting pod. For example, our B.Quiet Single Pod is 1030mm wide by 1030mm deep; the four-person Hush Chatterbox X is 2218mm wide by 1198mm deep. Allow for door operation, circulation, power and installation access as well as the pod itself. In a tighter space, a soft-seating nook may be more practical.

Can I fit a boardroom and an open floor in under 80m2? Usually, but not both at full size. A convertible meeting pod or a meeting zone that doubles as quiet space outside client hours is the common workaround — a fixed boardroom at full scale tends to sit empty most of the week in a space that size.

Is furniture hire a better option than buying for a small office? If headcount or layout is likely to change within 12-24 months, hire gives you the flexibility to reconfigure without writing off purchased stock. We cover the trade-offs in more detail on our furniture hire page.

Do I need a full fitout, or can I just reconfigure existing furniture? Depends on the gap. If the issue is pure layout — desk orientation, storage placement, acoustic separation — reconfiguration with some new modular pieces (pods, partitions) often solves it without touching the base build. Our partition and pod hire page covers what can go in without construction.

How long does a small office fitout take? A reconfiguration-style fitout (furniture, pods, partitions, no construction) in a space this size typically runs two to four weeks from confirmed design to installation, depending on lead times on specific pieces. Anything involving joinery or structural changes takes longer — worth scoping early if that's on the table.

What Actually Makes a Chair ‘Ergonomic’? Features That Matter and Marketing That Doesn’t

Close-up of an office chair's lumbar, seat depth and armrest adjustment mechanisms in a Melbourne office

"Ergonomic" is printed on the box of almost every office chair sold in Australia right now, including some that are barely adjustable at all. The word has stopped meaning much because nobody has to prove it before using it.

So what does it actually mean, and how do you tell a genuinely ergonomic chair from one that just uses the word well?

Ergonomic means it adjusts to the person, not the other way around

A chair is ergonomic if it can be fitted to the body using it, not because it has a mesh back or a headrest. Mesh looks modern and breathes better than foam, but mesh alone does nothing for posture. A headrest is comfortable for some people and in the way for others. Neither feature makes a chair ergonomic on its own.

What makes a chair ergonomic is a short list of adjustments that work together: seat height, seat depth, lumbar position, and armrest height and width. If a chair is missing two or three of those, it is a chair with ergonomic styling, not an ergonomic chair.

This matters because the gap between the two shows up fast once real people use the chair for a full workday. A chair that looks right in a product photo but doesn't adjust properly will get complaints inside the first month — sore lower backs, people perched on the edge of the seat, arms resting on a desk instead of the chair.

The features that actually do the work

Seat height range

Feet need to sit flat on the floor with knees roughly level with the hips. A chair with a narrow height range works for average-height staff and fails everyone outside that band. Check the actual range in millimetres, not just "adjustable" on the spec sheet.

Seat depth

This is the feature most "ergonomic" budget chairs skip. Without seat depth adjustment, a shorter person either sits with their back off the backrest or a taller person has the backrest pushing into their mid-back. Seat depth is less visible in marketing photos than lumbar bumps and headrests, which is probably why it gets left out.

Lumbar support that moves

Fixed lumbar support helps if it happens to land in the right spot for that person's spine. It helps nobody if it doesn't, and there's no way to know in advance who it will suit. Adjustable lumbar — height and sometimes depth — is the difference between a feature that works for one body type and one that works for a mixed team.

Independent armrest adjustment

Armrests that only move up and down are better than fixed armrests, but armrests that also move in and out, and sometimes pivot, do more of the actual job: taking weight off the shoulders without forcing the elbows wide or narrow to reach them.

Recline mechanism with tension control

A chair that only tips back at one fixed angle, or doesn't recline at all, keeps the user locked in one position for hours. Tension control lets the recline match body weight, so the chair doesn't flop back under a lighter person or refuse to move for a heavier one.

Base and gas lift rated for all-day commercial use

This is the feature nobody checks before buying and the one that fails first. A gas lift built for occasional home use will sink within a year under eight hours a day, five days a week. It's also the one spec that's genuinely invisible until the chair starts drifting down on its own.

The features that sound ergonomic but mostly aren't

Mesh back. Good for airflow in a warm office. Doesn't improve posture or support on its own — a mesh chair with no lumbar adjustment is still a chair with no lumbar adjustment.

Headrest. Useful for people who recline a lot or are noticeably tall. For most office work, sitting upright at a desk, it does very little and sometimes gets in the way during normal movement.

"Memory foam" seat padding. Comfortable for short sits. Over a full working day, dense foam that holds its shape under constant pressure usually outperforms memory foam, which can compress and lose support exactly where it matters.

Lumbar "massage" or vibration functions. Novel in a showroom, irrelevant to actual postural support, and one more thing to break.

Bright branding and a long feature list on the box. None of it tells you whether the seat depth adjusts or whether the gas lift will hold up under daily use. Read the actual spec sheet, not the bullet points on the packaging.

A fast way to check before you buy

Ask the supplier three direct questions:

  1. Does the seat depth adjust, not just the height?
  2. Does the lumbar support move, or is it fixed in one position?
  3. What's the gas lift and base rated for — home use or 8+ hours a day, 5 days a week?

If the answer to any of those is vague, the chair is probably ergonomic in name only. A chair that's honestly built for light use is fine for a meeting room or a part-time desk — the problem is only when it's sold and priced as if it will hold up to all-day use and doesn't.

Why this matters more once you're buying for a team

One ill-fitting chair is a minor annoyance. Twenty of them across an office is a maintenance and complaint problem that lands on whoever manages the furniture. Mixed teams need chairs that adjust across a wider range of body types, and that range is exactly what marketing-led "ergonomic" chairs tend to skip to hit a lower price point.

If you're assessing chairs for a team rather than a single desk, it's worth looking at our ergonomic office chairs range directly rather than relying on supplier descriptions, and testing the adjustment range in person before committing to a bulk order. If your current chairs are a mixed bag of ages and conditions, our chair repair service can also tell you which ones are worth adjusting and keeping versus replacing.

FAQ

Is a mesh chair automatically ergonomic? No. Mesh affects airflow and visual style, not adjustability. A mesh chair with fixed lumbar support and no seat depth adjustment is not meaningfully more ergonomic than a foam one with the same limitations.

Do I need a headrest for an ergonomic chair? Not usually, for standard desk work. Headrests suit people who recline frequently or are taller than average. For most upright desk-based work, it's a comfort preference rather than a postural requirement.

How do I know if a chair's gas lift and base will hold up to daily use? Ask the supplier for the duty rating, not just the warranty length. A chair rated for light or home use and a chair rated for 8-hour commercial use can look identical and cost similarly, but the internal components are built to very different standards.

Is a more expensive chair always more ergonomic? No. Price often reflects brand, materials, and styling as much as adjustability. Some mid-range commercial chairs out-adjust premium designer chairs that prioritise looks. Check the actual adjustment list, not the price tag.

What's the single most-skipped ergonomic feature in budget chairs? Seat depth adjustment. It's less visible in marketing than lumbar bumps or headrests, so it's commonly left out to hit a lower price, even though it's one of the features that affects comfort the most for people outside an average body size.

How to Choose Office Furniture for Your Business

A range of office chairs, desks and storage units arranged in a Melbourne showroom for comparison

Most furniture decisions get made backwards. Someone picks a chair because it looks right in a catalogue photo, then works out six months later that half the team has lower back complaints and the desks are the wrong height for the chairs. By then you've spent the budget and you're back to square one.

The better order is: start with how people actually work, then size the budget, then shop. Here's what that looks like in practice for a Melbourne or Geelong office.

Start with how the space is used, not what's on sale

Before opening a single supplier catalogue, walk the floor and answer three questions.

How many people sit at a desk for most of the day versus moving between zones? A sales team that's on the phone and in meetings all day needs less individual desk real estate than a finance team doing spreadsheet work for eight hours straight.

What's the headcount trend over the next 12-18 months? Buying furniture sized for today's team when you know you're hiring six more people in Q1 means doing this twice.

Where does the furniture need to fit? Measure doorways, lift access and stairwells, not just floor space. Flat-pack desks go anywhere; fully assembled boardroom tables do not.

If you're not sure how much room each desk needs, our guide on office space per person in Australia covers the practical minimums WorkSafe and most lease agreements expect.

Chairs first, desks second

It's tempting to think of furniture as one purchase, but chairs and desks solve different problems and deserve separate decisions.

A chair is the one piece of furniture someone's body is in contact with for seven-plus hours a day. Get this wrong and you're looking at OH&S complaints, workers' comp exposure, or staff quietly bringing in their own cushions. Our guide to choosing ergonomic office chairs in Melbourne walks through adjustability, lumbar support and what actually matters versus marketing features.

Desks matter more for layout and height than comfort. Standard desk height in Australia sits around 720mm for a fixed desk, but if your team varies in height by more than about 15cm, a sit-stand or height-adjustable option avoids buying the wrong fit for half the office.

New, second-hand, or hire — pick based on the project, not habit

There isn't a universally correct answer here. It depends on what you're solving for.

New furniture makes sense when you want warranty cover, consistent styling across a whole fitout, or the business is claiming the purchase as a tax-deductible asset this financial year.

Second-hand furniture can cut costs meaningfully on desks, storage and meeting tables — items where wear doesn't affect function much. Chairs are the exception: a used chair with a worn gas lift or compressed foam can cost more in staff complaints than it saved on the invoice. Our breakdown of second-hand versus new office furniture sets out where the savings are real and where they aren't.

Hire is worth considering for anything time-boxed — a six-month lease extension, a project team, or filling a gap while new stock is on order. Office desk hire in Melbourne avoids tying up capital in furniture you might not need past the project's end date.

Budget by category, not by total spend

A single lump "furniture budget" tends to get eaten by whichever category is loudest — usually desks, because they're the most visible line item. Split the budget instead:

  • Seating (the highest-risk category if done wrong)
  • Desks and workstations
  • Storage and filing
  • Meeting and breakout furniture
  • Contingency for the items you forgot (monitor arms, cable management, mats)

As a rough guide for a 20-person Melbourne office fit-out budget, chairs and desks combined usually account for 55-65% of furniture spend, with the rest split across storage, meeting settings and soft furnishings. Treat that as a starting ratio, not a rule — a business running mostly client meetings will flip more budget into the boardroom table and less into individual desks.

Durability matters more than finish

Showroom lighting flatters everything. What tells you more about long-term value is the warranty length, the weight rating on chairs, and whether the supplier stocks spare parts (gas lifts, castors, arm pads) for when something eventually wears out. A chair you can repair for $80 in year three beats one you have to replace entirely because the manufacturer discontinued the model. If a chair in your existing fleet is already showing wear, it's often cheaper to repair than replace — see office chair repairs for what that typically costs.

A simple decision order

  1. Map the space and headcount trajectory.
  2. Fix seating first — it's the highest-risk, highest-complaint category.
  3. Set desk height and layout around how the team actually works, not a generic template.
  4. Decide new vs second-hand vs hire per category, not for the whole project.
  5. Budget by category so seating doesn't get squeezed by a flashy boardroom table.

Get the order right and the shopping part is straightforward. Get it backwards and you're replacing chairs again in 18 months.

FAQ

How much should a small business budget for office furniture per desk? For a standard workstation (desk, task chair, basic storage) in Melbourne, expect roughly $600-$1,200 new depending on chair quality and desk type, less for second-hand desks paired with a new chair.

Is it better to buy new or second-hand office furniture? It depends on the item. Second-hand desks, tables and storage are usually fine. New chairs are worth the extra cost because wear in seating directly affects comfort and OH&S risk.

What's the standard desk height in Australia? Around 720mm for fixed desks, with height-adjustable desks typically ranging 650-1250mm to suit a wider range of staff heights.

Should I hire furniture instead of buying it? Hire suits short-term needs — project teams, lease extensions, or bridging a gap before new stock arrives. For anything permanent past 12 months, buying is usually the cheaper option.

How do I know if existing chairs need repair or replacement? Check the gas lift, castors and base mechanism first — these are the most common failure points and the cheapest to fix. If the frame or foam has failed, replacement is usually the better value.

Ready to fit out your office?

If you're planning a furniture purchase for a new fit-out, expansion or refresh, talk to The Agile Office about new office furniture in Melbourne. We'll help you work out what to prioritise within your budget before you start shopping.

The Office Fitout Checklist: What to Sort Before Work Starts

Mid-fitout Melbourne office space with partition framing and stacked furniture panels during construction

Most fitout delays don't come from the build. They come from decisions nobody made three weeks before the build started — a landlord consent still sitting in someone's inbox, a chair order nobody placed because "we'll sort furniture later," an IT cutover that was never actually scheduled against the electrical rough-in.

If you're planning a Melbourne or Geelong office fitout, here's what actually needs to be locked in before the first trade sets foot on site — not a generic project management checklist, but the specific items that cause real slippage.

Before you sign anything

Lease and make-good terms. Read the make-good clause before you sign the new lease, not after you've committed to the old one's exit date. Some leases require you to strip back to base building; others let you leave fit-for-purpose improvements for the next tenant. This changes your budget and your timeline for both ends of the move.

Landlord consent process. Most commercial leases require written landlord approval for any works beyond cosmetic. Ask what the landlord needs — drawings, insurances, contractor inductions — and how long they typically take to sign off. Two to three weeks is normal in Melbourne CBD buildings; treat anything faster as a bonus, not the plan.

A realistic budget range, not a single number. Melbourne fitouts run roughly $450 to $800 per sqm for a basic refresh, $800 to $1,500 for a mid-range fitout, and $1,500 to $2,800+ for a premium build with custom joinery and branded finishes. Geelong tends to sit 10 to 20 percent below Melbourne for comparable scope. Know which tier you're in before you start asking for quotes, or every number you get back will look wrong.

Before design starts

Headcount and growth plan. Not just today's headcount — where you'll be in two to three years. A fitout sized exactly for current staff numbers with no slack is the fastest way to end up hiring a second fitout provider sooner than planned.

Adjacency requirements. Which teams need to sit near each other, which need separation, where the meeting rooms and quiet spaces go. This is a conversation with whoever actually runs day-to-day operations, not just whoever signs off on budget — they know where the current layout actually breaks down.

Power and data audit, especially in older buildings. Older Melbourne CBD tenancies often have cabling and distribution boards left over from a previous tenant that don't suit a modern layout. Get this checked early; discovering it during the electrical rough-in adds cost and time you didn't budget for.

Before you order anything

Long-lead furniture, ordered with the design — not after the build starts. Quality task chairs, height-adjustable desks and acoustic pods regularly carry four to eight week lead times. If furniture decisions wait until the walls are up, you'll either delay handover or move into an office with borrowed chairs.

IT and AV scheduling against the electrical program. Data cabling, access points and meeting room AV need to be coordinated with the rough-in stage, not bolted on after furniture arrives. Confirm who owns this — your IT provider, the fitout contractor, or both — before week one.

Joinery and custom finishes. A laminate kitchen is a stock item. A stone-top breakout kitchen or a custom-veneer boardroom table is a fabrication job with its own lead time, often four to six weeks. Decide on these early, because they're usually the first thing that gets rushed when a timeline slips.

Before the build starts

A buffer week. A fitout with zero contingency is really a longer fitout the moment one delivery runs late — and something usually does. Build the buffer into the schedule Michael's team gives you, don't treat it as an optional extra.

Occupied-building logistics, if staff stay on site. Dust control, noise scheduling, after-hours trades and temporary partitioning need to be written into the program from day one if your team keeps working through construction. Retrofitting these mid-project costs more than planning for them upfront.

A defect and snag week before go-live. Don't assume day one is move-in ready. Book a proper snag list review before handover so problems get fixed before staff arrive, not after.

The one question that catches people out

If you can't answer "when do the chairs need to be ordered by" with an actual date, you don't have a fitout timeline — you have a hope. Most of the checklist above exists to turn that hope into a schedule someone can actually be held to.

Where this fits with cost and timeline planning

This checklist works alongside two other things you'll need early: a realistic cost range for your square metreage and a timeline mapped to your actual move-in date, not a generic industry average. If you're still working out what a fitout actually involves stage by stage, that's covered separately too.

Get the checklist turned into a schedule

A checklist tells you what to sort. It doesn't tell you in what order, or what happens when two items collide — like when the landlord consent is still pending and your furniture lead time is already ticking. That's what a Melbourne or Geelong office fitout consultation is for: we walk the space, work through the list against your actual move-in date, and tell you honestly where the risk sits before you commit to a contractor.

Book a free site visit and we'll turn this checklist into a schedule with real dates against it.

FAQ

How far ahead should I start this checklist before a planned move-in date? For an 8-week standard fitout, start eight to ten weeks out. For a full 12-week commercial fitout, start at least three months ahead so long-lead furniture and joinery aren't the thing holding up handover.

What's the single most common item people miss? Furniture lead times. Chairs, height-adjustable desks and acoustic pods are treated as an afterthought when they should be ordered alongside the design, not after the walls go up.

Do I need a full design consultation, or is a checklist enough? If your project is under $20,000 or you already know exactly what you want, a direct fitout quote usually covers it. Bigger or more complex projects benefit from a proper space plan first, since the checklist only works if the layout behind it is already right.

Who should own the landlord approval process — us or the fitout contractor? Whoever manages the landlord relationship day to day, usually you or your tenant rep, should confirm requirements early. A good fitout contractor will then prepare the actual submission pack — drawings, insurances, inductions — so you're not chasing paperwork mid-project.

What happens if I skip the buffer week? Nothing, until a delivery slips — which happens on most projects at least once. Without a buffer, that single delay pushes your entire move-in date rather than absorbing into slack that was already planned for.

How to Set Up an Ergonomic Workstation: A Practical Guide for Australian Offices

Ergonomic office workstation with adjustable chair, sit-stand desk and monitor arm in a Melbourne office

Most ergonomic injuries in offices don't come from one bad day. They come from a chair set two centimetres too low, a monitor angled just enough to strain the neck, or a desk height nobody adjusted after the last person left. Small mismatches, repeated eight hours a day, five days a week.

This guide covers what actually matters when you're setting up a workstation for WHS compliance and for people who'll be sitting there long after the audit is over.

Start with the chair, not the desk

Desk height gets fixed once. Chairs get fought with daily. If you're setting a budget priority, put it here first.

A workstation chair needs four adjustments that actually get used:

  • Seat height, so feet sit flat on the floor or a footrest, with knees roughly level with hips
  • Seat depth, leaving two to three finger-widths between the seat edge and the back of the knee
  • Lumbar support that sits in the small of the back, not somewhere near the shoulder blades
  • Armrest height that lets shoulders relax, not shrug

We see a lot of offices buy chairs with all four adjustments on paper, then never train staff to use them. A $600 chair set wrong does less for someone's back than a $300 chair set right. If you're rolling out new seating across a floor, budget half a day for a walkthrough — five minutes per person, chair by chair.

Desk height and monitor position

Standard desk height in Australia sits around 720mm, which suits a seated adult of roughly 170–180cm. Anyone shorter or taller than that range needs either a height-adjustable desk or a footrest and monitor riser to compensate.

For monitor position:

  • Top of the screen at or just below eye level
  • Screen distance roughly an arm's length away
  • Laptop users need a separate keyboard and mouse if the laptop is the primary screen — hunching over a built-in keyboard while looking down at a laptop screen is one of the most common posture complaints we hear about

If your team runs a mix of heights — common in most Melbourne and Geelong offices with 10+ staff — a sit-stand desk removes the single-height problem entirely. It's also the fastest way to satisfy WHS reviewers asking about adjustable workstations, since it covers the adjustment requirement without configuring each desk individually.

Keyboard, mouse and reach

Keep the keyboard and mouse close enough that elbows stay near the body, roughly 90–110 degrees at the elbow. Reaching forward for a mouse that's too far away is a slow, low-grade strain that people rarely connect to their workstation until a physio asks about it.

Wrist rests help some people and do nothing for others — treat them as optional, not a fix for a badly positioned keyboard.

What WHS reviewers actually check

Under Victorian WHS guidance, employers have a duty to provide workstations that don't create unnecessary risk of musculoskeletal injury. In practice, a reviewer or WHS consultant checking your office will look for:

  • Adjustable-height desks or documented individual setup for fixed-height desks
  • Chairs with working lumbar, seat depth and height adjustment
  • Monitor arms or risers where laptop-only setups exist
  • A basic self-assessment or induction process for new starters

None of this requires replacing every desk in the building. It requires a documented, consistent setup process and equipment that's actually adjustable — not equipment that looks adjustable in a spec sheet.

Setting up for a mixed team

Open-plan offices rarely have one "right" setup. A 25-year-old graduate and someone recovering from a shoulder injury need different configurations at the same desk if it's shared or hot-desked. Two things make this manageable:

  1. Height-adjustable desks with saved presets, so switching users takes seconds, not a full readjustment
  2. A short onboarding checklist — five settings, five minutes — that new starters or new desk users run through instead of guessing

Fitouts that skip this step tend to end up with staff bringing in their own cushions, footrests and laptop stands within the first month. Building ergonomic flexibility into the furniture spec from the start avoids that patchwork.

Getting it right without overspending

You don't need premium everything. Prioritise:

  1. A properly adjustable chair for every desk-based role
  2. Sit-stand capability for shared desks or mixed-height teams
  3. Monitor risers or arms wherever a laptop is the main screen
  4. A five-minute setup checklist, used consistently

That sequence covers most WHS risk and most day-to-day discomfort complaints, without needing a full furniture refresh.

If you're planning a new fitout or refreshing existing workstations, The Agile Office's new office furniture range covers adjustable chairs, sit-stand desks and monitor arms sized for Melbourne and Geelong offices. We can also run a short on-site walkthrough to check current setups against WHS guidance before you buy anything new.

FAQ

What's the standard desk height in Australia? Around 720mm for a fixed desk, suited to a seated adult roughly 170–180cm tall. Outside that range, use a height-adjustable desk or add a footrest and monitor riser.

Do I legally need sit-stand desks for WHS compliance? No single piece of equipment is mandated. Victorian WHS guidance requires employers to manage musculoskeletal injury risk, which sit-stand desks help address for mixed-height or hot-desked teams, but a well-set-up fixed desk with proper chair adjustment can also meet the duty.

How often should workstation setups be reviewed? At minimum when someone starts in a new role or desk, and after any reported discomfort. Many Melbourne offices build a quick check into onboarding and annual WHS reviews.

What's the single highest-impact change for an existing office? Getting chairs adjusted properly for each person. It costs nothing beyond staff time and fixes more day-to-day discomfort than most equipment purchases.

Can I set up an ergonomic workstation with existing furniture? Often, yes. Chair adjustment, monitor height and keyboard/mouse position cost nothing to correct. New equipment becomes worthwhile once you've confirmed the existing gear is genuinely limiting — a fixed-height desk for a team with a wide height range, for example.

What Is an Office Fitout? What’s Included and What It Involves

A commercial office space mid-fitout with finished partitions on one side and exposed ceiling services on the other.

Most people asking "what is an office fitout" have never done one before, and that's the whole problem. The term gets thrown around by agents, builders, and furniture suppliers to mean wildly different things, and a definition helps before you get three quotes that don't match each other.

An office fitout is the work that turns a bare or existing commercial space into a functioning workplace: partitions, flooring, electrical and data cabling, lighting, joinery, and furniture. It sits between the building shell (what the landlord hands over) and the finished office you actually work in.

Why the definition matters before you get quotes

Fitout scope varies more than most first-time buyers expect. One supplier's "fitout" is paint, carpet tiles, and furniture delivery. Another's includes moving walls, running new data cabling, and coordinating an electrician and a certifier. If you don't know which one you're asking for, you can't compare quotes properly, and you'll end up back at square one when the cheap quote turns out to exclude half the job.

We get this call a lot: someone has a quote for "$40,000" and another for "$140,000" for what sounds like the same office, and they want to know which one is right. Usually neither is wrong. They're pricing different scopes.

The two broad categories

Base building vs. tenant fitout. The base building is structural: floors, core walls, fire systems, the building's mechanical services. A tenant fitout is everything layered inside that shell to make the space usable for your business.

Cat A vs. Cat B. This split matters if you're leasing. Cat A fitout is what a landlord often provides or a tenant installs before occupation: raised floors, suspended ceilings, basic lighting and mechanical services, sometimes a blank canvas ready for walls. Cat B is the tenant-specific layer on top: partitions, meeting rooms, joinery, branding, furniture, and IT infrastructure. If your lease says "Cat A shell," expect to budget for everything else yourself.

What's actually included in a typical fitout

For a standard commercial office fitout in Melbourne, the scope usually covers:

  • Partitioning and internal walls (glass, plasterboard, or acoustic)
  • Flooring (carpet tile, vinyl, polished concrete)
  • Ceiling and lighting upgrades
  • Electrical and data/comms cabling
  • Joinery: reception desks, kitchenettes, storage
  • Painting and finishes
  • HVAC adjustments where layout changes airflow
  • Furniture: desks, chairs, meeting tables, storage, breakout seating
  • Signage and branding elements
  • Compliance items: fire egress, accessibility, building certification sign-off

Furniture is usually the last line item people think about and the first thing staff notice on day one. A beautifully finished space with the wrong chairs still gives people back pain by week three.

What a fitout project actually involves, in order

  1. Brief and site assessment. What's the headcount, growth plan, and how do people actually work — desks, hot-desking, meeting rooms, quiet zones?
  2. Concept design and space planning. Layout drawings, furniture placement, and a rough budget range.
  3. Detailed design and documentation. Final finishes, electrical/data layout, joinery drawings, furniture specification.
  4. Quoting and trade coordination. Builder, electrician, data cabler, furniture supplier — either managed separately or bundled under one project manager.
  5. Construction and installation. Typically 4-10 weeks for a standard tenancy fitout depending on scope, building access hours, and whether you're working around an occupied space.
  6. Furniture delivery and install. Usually scheduled in the final one to two weeks, after trades clear out and floors are protected.
  7. Handover and defects period. Walkthrough, punch list, and a defects liability window before final sign-off.

The step people underestimate most is trade coordination. A fitout with five different suppliers who don't talk to each other is how you end up with data points installed in the wrong wall, or furniture arriving before the flooring is cured.

Common questions we get on the phone

Clients rarely ask "what is a fitout" in those words. They ask things closer to these:

  • Does my quote include furniture, or do I need to budget for that separately?
  • Can we do the fitout in stages if we're not moving all staff at once?
  • How much notice do we need to give before construction starts, especially around building access after hours?
  • What happens if we're locked into a make-good clause at lease end — does that affect what we install now?
  • Do we need a certifier involved, or is that only for larger structural changes?

These are the questions that actually decide budget and timeline, more than the word "fitout" itself.

The Geelong and Melbourne angle

Access hours differ site to site. A CBD tower with a single freight lift books trade access weeks ahead; a Geelong industrial park with ground-floor access can move faster. Either way, plan the access booking before you lock a start date, not after.

Where to start

If you're at the "what is a fitout" stage, you're at the brief and site assessment step, not the furniture-shopping step. Get the scope defined first: what's structural, what's Cat B, what's furniture. That's what actually lets you compare quotes fairly and avoid the surprise variation halfway through.

We run consultations for businesses planning their first fitout, from a single-floor office through to multi-site relocations. If you want a straight answer on what your space actually needs, get in touch about an office fitout.

FAQ

What's the difference between a fitout and a renovation? A renovation typically changes the building's structure or base services. A fitout is the tenant-side layer built inside an existing or newly leased shell — partitions, finishes, and furniture, without necessarily touching structural elements.

How long does a typical office fitout take? Most standard tenancy fitouts run 4-10 weeks from construction start to furniture install, depending on scope, trade availability, and building access hours. Larger or staged projects can run longer.

Does an office fitout include furniture? Not always. Many builders price the construction scope only, with furniture quoted separately. Confirm this explicitly before comparing quotes, since it's the single biggest reason two quotes for the same space look wildly different.

Do I need a fitout if I'm just moving desks around in the same office? Probably not a full fitout. Minor layout changes, new furniture, or a reconfiguration usually falls under furniture and space planning rather than a construction fitout, unless you're also changing walls, power, or data points.

What happens to old furniture during a fitout? Options include reuse in the new layout, donation, resale, or disposal. Worth deciding early, since storage space during construction is often tighter than clients expect.

How Much Office Space Do You Need Per Person in Australia?

A modern open-plan office with evenly spaced desks and a glass-walled meeting room in the background

Most businesses find out they've under-sized their office the hard way: three months into a new lease, when the desks are in and there's nowhere left to put the fourth filing cabinet or the meeting table nobody remembered to plan for.

The short answer to "how much space per person" is 8 to 10 square metres in a modern open-plan office, more if you're running a lot of meeting rooms, breakout zones, or specialist areas like a reception or a server room. But that number moves a lot depending on how your team actually works, and getting it wrong in either direction costs you.

Why this number matters before you sign a lease

Landlords and agents quote space in square metres, and most Melbourne CBD or fringe leases run three to five years. If you size for today's headcount with no room to grow, you're either renegotiating early or squeezing new hires into a space that was never meant to hold them. If you size too generously, you're paying rent, cleaning, and utilities on square metres nobody uses.

We get called in most often at exactly this point — a business has a lease on the table, a headcount forecast, and no real idea whether the floorplan works. Getting the space-per-person number right before you sign saves a second, more expensive fitout six months later.

The standard ranges

For a typical Australian office fitout, these are the numbers we work from:

  • Open-plan desks: 8–10 sqm per person, including circulation space (the walkways and clearance around desks, not just the desk footprint)
  • Activity-based working (ABW) or hot-desking: 6–8 sqm per person, because you're not building one desk per employee
  • Executive or private offices: 12–15 sqm per office
  • Meeting rooms: budget roughly 2–2.5 sqm per seat, plus AV and cable management space
  • Reception and breakout areas: add 10–15% of total floor area for shared zones that don't map to a headcount at all

These aren't Australian Standard figures — there's no single mandated ratio — but they're what property agents, fitout builders, and workplace strategists use as a starting point across Melbourne and Geelong offices we've worked on.

Where the number goes wrong

Two mistakes show up again and again on the jobs we quote.

The first is sizing for current headcount only. A business with 20 staff signs a lease for exactly 20 desks' worth of space, then hires five people in year two and has nowhere to put them. We always ask for a 12–24 month growth forecast before we start a layout, even a rough one.

The second is ignoring how the team actually works. A business that's mostly remote three days a week doesn't need one desk per person — it needs fewer desks and more shared meeting and collaboration space. We've done fitouts where the client thought they needed 40 desks and, once we mapped actual in-office attendance, ended up with 28 desks and two extra meeting pods for the same headcount. That's a real cost saving on lease size, not just a nicer layout.

A rough worked example

Take a 30-person professional services business planning a standard fitout:

  • 30 desks at 9 sqm = 270 sqm
  • Two meeting rooms (8 seats, 4 seats) = roughly 30 sqm
  • Reception and breakout at 12% of the above = 36 sqm
  • Kitchen, storage, comms room = 20–25 sqm

That lands around 360 sqm total, or roughly 12 sqm per person once everything shared is factored in — higher than the raw 8–10 sqm desk figure, which is the number people usually quote first and then get surprised by.

Practical decision framework

Before you commit to a lease size, work through this:

  1. Confirm current headcount and a realistic 18-24 month growth number, not a best-case one
  2. Decide your working model — fixed desks, hot-desking, or a hybrid split — because this changes the per-person number more than anything else
  3. List the shared spaces you actually need: how many meeting rooms, what size, any quiet rooms or phone booths
  4. Add circulation and shared-zone allowance (10-15% of desk area) rather than assuming the landlord's quoted sqm is all usable floor
  5. Get a layout drawn against the real number before signing, not after

Local angle

Melbourne CBD lease rates make over-sizing expensive fast, and a lot of the smaller Geelong and regional offices we work with are the opposite problem — they've outgrown a space that felt generous five years ago and didn't notice until the team stopped fitting comfortably. Either way, a proper space plan before you sign, not after, is the difference between one fitout and two.

CTA

If you've got a lease on the table or a headcount forecast that doesn't quite match your current floorplan, we'll run a space plan against the real numbers before you commit to anything. Book a free fitout consultation and we'll tell you honestly whether the space works.

FAQ

How much office space do I need per employee in Australia? Budget 8-10 sqm per person for a standard open-plan desk layout, including walkways and circulation space. Hot-desking or activity-based working can bring that down to 6-8 sqm. Add extra for meeting rooms, reception, and breakout areas — most offices land closer to 10-12 sqm per person once shared space is included.

Is there an Australian Standard for office space per person? No single mandated ratio exists for commercial offices in Australia, unlike some workplace health and safety minimums for specific industries. The 8-10 sqm range is an industry convention used by property agents and fitout builders, not a legal requirement.

Should I size my office for current staff or future growth? Size for a realistic 12-24 month forecast, not just today's headcount. Most leases run three to five years, and re-fitting or renegotiating early because you've outgrown the space costs more than building in modest growth room from the start.

Does hot-desking actually reduce the space I need? Yes, but only if attendance is genuinely lower than headcount. If your team is in the office four to five days a week, hot-desking without enough desks just creates a shortage. Map actual attendance patterns before assuming you can cut desk numbers.

How do I get an accurate space plan before signing a lease? Bring us your floorplan or the space on offer along with your headcount and growth forecast, and we'll map it against a real layout before you commit. It's a lot cheaper to find out the numbers don't work at this stage than after the lease is signed.

What to Do With Old Office Furniture in Melbourne (Besides the Skip)

Task chairs and a disassembled desk stacked in a bright office during a workplace move

Every office move or refresh leaves you with a pile of furniture nobody wants anymore. Desks that don't fit the new floor plan. Chairs with the padding gone flat. A boardroom table too big for the new suite. Someone always asks the same question in the last week before handover: what do we actually do with all this?

The honest answer is that most of it doesn't need to go to landfill. It just needs someone to sort what's worth keeping, what's worth repairing, and what genuinely has to go.

Why this comes up on almost every job

We rarely get called in purely to dispose of furniture. It shows up as a side problem on a bigger project: a fit-out, a relocation, a downsize after a lease renewal. The client has budgeted for new furniture and new joinery, and somewhere around week three someone realises the old chairs, desks and filing cabinets aren't included in the removalist's quote.

Skip bins solve the logistics problem but not the cost or the waste problem. A 6-cubic-metre skip in Melbourne runs somewhere around $400-$600 depending on your postcode and what's in it. Office furniture is bulky, so you'll often need two or three. That's real money spent to bury furniture that, in a lot of cases, still works.

What's actually worth keeping

Not everything survives a move in good shape, but more does than people expect.

Task chairs are the biggest opportunity. A chair with a broken gas lift, torn upholstery, or a cracked armrest looks like a write-off but is usually a $60-$180 repair. We've assessed batches of 40+ chairs from a single office and found 60-70% were repairable rather than replaceable — same brand, same footprint, back in service within a week.

Height-adjustable desks almost always survive a move intact. The motors and frames are built for years of daily use. If the laminate top is scratched or the wrong colour for the new fitout, it's often cheaper to reface or swap the top than replace the whole unit.

Storage and filing units hold up well structurally. Locks stick and drawer runners wear out, but both are minor fixes compared to buying new.

What genuinely doesn't survive: fabric task chairs past ten years old where the foam has fully collapsed, laminate desks with water damage or delamination, and anything that's been stored outside or in a damp warehouse.

The three real options

Repair and keep. Makes sense when the furniture still suits the new layout and the fix cost is well under replacement cost. We see this most with chairs — gas lifts, castors, and tilt mechanisms are the usual failure points, and none of them require a new chair.

Donate or resell. Good-condition furniture that doesn't fit your new space but still has years of life left can go to a charity, a smaller business, or a furniture reuse network. Melbourne has a handful of commercial furniture recyclers who'll collect on-site if the volume justifies it — worth checking before you book a skip.

Recycle or dispose properly. For furniture that's genuinely at end of life, proper recycling separates steel frames, aluminium, and fabric/foam rather than sending it all to landfill as mixed waste. Ask whoever collects it what they actually do with it — a lot of "recycling" pickups still end at the tip.

A practical decision framework

When you're staring down a pile of old furniture, this is roughly how we sort it on-site:

  1. Does it fit the new floor plan or layout? If not, skip to option 2 or 3 regardless of condition.
  2. If it fits, is the fault mechanical (gas lift, castor, hinge) or structural (frame crack, water damage)? Mechanical faults are almost always cheaper to fix than replace.
  3. If it's beyond repair, is it still functional enough to donate? Chairs and desks with cosmetic wear but working mechanisms are usually fine for a smaller office or community organisation.
  4. What's left goes to proper recycling, sorted by material where the collector allows it.

Running this sort before the move, not during it, saves a full skip's worth of furniture most of the time.

The local angle

Melbourne businesses moving or refreshing an office are usually working to a fixed handover date, which means the old furniture question gets rushed. We schedule chair assessments and pickups around the same timeline as the fit-out itself, so it's one less thing competing for attention in the final week. We've kept more than 5,000 chairs out of landfill this way — most needed nothing more than a new gas lift or a re-upholster.

If you're planning a move or refresh and don't know yet what's worth keeping, get an assessment done before you book the skip. It usually costs less than the skip would.

Get an assessment

If you've got chairs, desks, or storage left over from a move or refresh, we'll assess what's repairable before you write it off. Book a chair assessment through our chair repairs service, or if you're planning the whole move, talk to us about office fit-outs in Melbourne so old and new furniture get planned together from the start.

FAQ

Is it cheaper to repair old office chairs or buy new ones? Usually repair, if the fault is mechanical. A gas lift or castor replacement is typically $60-$180 per chair, well under the cost of a comparable new task chair.

What happens to office furniture that can't be repaired or donated? It should go to a recycler who separates steel, aluminium, fabric and foam rather than sending it to landfill as general waste. Ask your collector what happens to the materials after pickup.

Can you assess furniture before we've decided on a moving date? Yes. An early assessment gives you time to plan repairs, donations, or disposal properly instead of rushing it in the last week before handover.

Do you collect old furniture as part of a fit-out project? We can coordinate old furniture assessment and removal alongside a new fit-out or furniture supply project, so it's handled on the same timeline rather than as an afterthought.

Is there a minimum number of chairs or desks for an assessment? No. We've assessed single chairs and full-floor fit-outs. If you've got more than a handful of items, it's worth doing before you book any disposal.

Is Office Furniture Tax Deductible in Australia?

A row of new ergonomic office chairs and desks in a bright modern Melbourne office.

Every June, the same question comes through our phone line: is office furniture tax deductible, and can we get it delivered before the financial year ends? Short answer: for most businesses, yes, office furniture is a deductible business expense. The longer answer depends on how you buy it, what it costs, and which depreciation rules apply to your business that year.

We're not accountants, and this isn't tax advice. We build and fit out offices, so we know what furniture businesses buy, roughly what it costs, and what our clients' accountants have told them over the years. If you're planning a purchase around EOFY, talk to your accountant about your specific situation before you commit. This article is here to help you ask them the right questions.

Why this comes up every EOFY

Office furniture is a capital asset, not a running cost like electricity or stationery. That means it generally isn't fully deductible in the year you buy it — it gets depreciated over its "effective life," which the ATO sets differently for desks, chairs, partitions and so on.

The exception that gets everyone excited is the instant asset write-off. In years where it applies, eligible businesses can claim the full cost of an asset in the year of purchase instead of spreading it out. The threshold and eligibility rules change from year to year, and sometimes mid-year, so whatever number you heard at a barbecue last EOFY might already be wrong. Check the current ATO threshold, or better, ask your accountant, before you plan a big order around it.

What we actually see clients do

A few patterns come up again and again in our showroom and on fitout jobs:

The EOFY chair order. A business with 15-20 staff decides in May that half the chairs are past their working life. They want new ergonomic seating delivered and invoiced before June 30 so it lands in this year's tax return, not next year's. We can usually turn around a stock chair order (say, 20 units of something like the Sidiz T50 or similar) within 5-10 business days if it's in stock locally. Custom fabric or backorder items can push out to 3-4 weeks, so early May is genuinely the last safe window to start that conversation, not late June.

The pre-fitout furniture spend. Businesses doing a full office fit-out often want to know whether the furniture line item and the construction/fit-out line item get treated differently for tax purposes. They usually do — loose furniture (desks, chairs, storage) depreciates differently to fixed fit-out elements like partition walls or built-in joinery. That's a conversation for your accountant and quantity surveyor, not us, but it's worth raising early in project planning so your finance team isn't surprised later.

The "can I just expense it" question. Smaller purchases — a handful of task chairs, a meeting table — sometimes fall under a lower-value asset threshold that lets a business expense them outright rather than depreciate them. Where that threshold sits depends on your business structure and the current ATO rules for that year.

What generally affects the tax treatment

None of this is advice for your specific business, but here's the shape of what usually matters:

  • Whether you're a small business entity under the ATO's definition
  • The cost of each individual item (some rules apply per-asset, not per-order)
  • Whether the instant asset write-off is currently in effect and what the threshold is
  • Whether the furniture is new or second-hand — this doesn't usually change deductibility, but it can affect the value you're depreciating from
  • Whether the purchase is for a home office versus a commercial premises, which has different rules again
  • Your business structure (sole trader, company, trust) — depreciation and write-off eligibility can differ

A practical decision framework

If you're weighing up an office furniture purchase around tax time:

  1. Talk to your accountant first about your current-year eligibility and threshold, not last year's rules.
  2. Get a real quote with lead times, not just a rough budget number, so you know if delivery and invoicing can realistically land before June 30.
  3. Separate "must replace now" items (broken chairs, safety issues) from "would be nice" items, so the tax conversation doesn't drive decisions that don't actually need to happen yet.
  4. If you're doing a bigger spend, ask whether staging the order across two invoices makes sense for your cash flow and depreciation schedule — sometimes it does, sometimes it complicates things unnecessarily.

The Melbourne and Geelong angle

Lead time is the real constraint most years, not the tax rule itself. If you're in Melbourne or Geelong and want furniture landed before June 30, the practical cutoff for stock items is usually late May. For anything custom — specific fabric colours, non-standard desk configurations, larger fit-out furniture packages — you want that conversation happening in April. We keep a reasonable stock buffer of common chairs and desks specifically because EOFY demand spikes every year, but backorders on manufacturer-specific items are outside our control.

If your furniture purchase is part of a broader office upgrade rather than a standalone chair or desk order, it's worth looking at the fit-out picture as a whole — see our office fit-outs Melbourne page for how furniture and fit-out timelines usually interact.

CTA

Thinking about an EOFY furniture purchase? Get a quote with real lead times so you know what's achievable before June 30 — browse new office furniture Melbourne or check our office furniture Geelong range, and we'll tell you straight if your timeline works. For the tax side, that conversation belongs with your accountant.

FAQ

Is all office furniture tax deductible in Australia? Most office furniture used for business purposes is deductible in some form, either depreciated over its effective life or claimed in full under an instant asset write-off if your business is eligible that year. Whether it applies fully to your situation depends on your business structure and the current ATO rules — check with your accountant.

What's the difference between depreciating furniture and using the instant asset write-off? Depreciation spreads the deduction over the item's effective life, so you claim a portion each year. The instant asset write-off, when it applies, lets an eligible business claim the full cost in the year of purchase. Eligibility and thresholds change year to year.

Does buying second-hand office furniture change how it's taxed? Deductibility generally still applies to second-hand furniture used for business, but the depreciable value is usually based on what you paid, not the original retail price. Ask your accountant how this applies to your specific purchase.

How late can I order office furniture and still have it delivered before June 30? For stock items we hold locally, we can usually manage 5-10 business days. For anything custom or backordered, plan for 3-4 weeks, which means starting the conversation in April or early May rather than late June.

Is furniture for a home office treated the same as furniture for a commercial office? No, home office furniture typically falls under different rules than furniture for a dedicated business premises, and the deduction can depend on how much the space is used for work versus personal use. This is one to run past your accountant specifically.